|
|
TM 5-2410-233-23
EQUALIZER BAR ASSEMBLY REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
Tool kit, general mechanic's (Item 112, WP 0185
Two
Equipment Condition
Shop equipment, general purpose repair (Item 97,
Right-front track carrier roller removed (WP 0114
Materials/Parts
Two frontmost track roller frame guards removed
Wood block, 4 in. x 4 in. x 12 in.
Lockwasher (2)
Crankcase and transmission guards opened (WP
References
TM 5-2410-233-10
Machine lifted off ground (WP 0178 00)
REMOVAL
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death.
NOTE
Equalizer bar weighs 300 lb (136 kg).
1.
Remove two bolts (1), lockwashers (2), plates (3) and
pads (4) from equalizer bar (5). Discard lockwashers.
2.
From rear of tractor, position hydraulic floor jack
under equalizer bar (5). Raise jack until it contacts
equalizer bar.
5
3
2
4
1
386-149
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |