| ||||||||||
| 
 
  | 
![]() TM 5-2420-222-20-1 
Section IX. FUEL SYSTEM 
Page 
Page 
Accelerator Pedal, Foot Accelerator 
Fuel Metering Pump Adjustment.......................... 2-222 
Rod, and Speed Control Arms ................2-328 
Fuel Pump 
......................................... 2-226 
Air Cleaner 
.........................................2-237 
Fuel Pump-to-Fuel Filter Fuel 
Air Cleaner Hoses and Pipes ...............................2-244 
Line 
......................................... 2-288 
Air Inlet Housing 
.........................................2-232 
Fuel Shutoff Valve 
......................................... 2-273 
Engine Starting Aid Fluid Injection 
Fuel Shutoff Valve-to-Fuel Pump 
......................................... 2-296 
Fuel Line 
......................................... 2-264 
Engine Starting Aid Fluid Injection 
Fuel System Priming ......................................... 2-340 
Tube and Fittings .................................... 2-306 
Fuel Tank 
......................................... 2-254 
Fuel Cap 
.........................................2-262 
Fuel Tank Draining 
......................................... 2-250 
Fuel Filter Assembly  .........................................2-277 
Hand Throttle Cable  ......................................... 2-322 
Fuel Filter Elements  .........................................2-284 
Hand Throttle Lever  ......................................... 2-315 
Fuel Filter-to-Fuel Metering Pump 
Hand Throttle Lever and Cable 
Fuel Line 
.........................................2-292 
Adjustment 
......................................... 2-311 
Fuel Injection Caps and Hoses ............................ 2-206 
Leak-Off Cap-to-Fuel Tank Fuel 
Fuel Injection Nozzles .........................................2-201 
Line 
......................................... 2-268 
Fuel Injection Tubes  .........................................2-213 
Speed Control Rod 
......................................... 2-336 
FUEL INJECTION NOOZZLES 
This task covers: 
a. Removal (page 2-202) 
c. 
Inspection/Replacement (page 2-204) 
b. Cleaning (page 2-202) 
d. 
Installation (page 2-204) 
INITIAL SETUP 
Tools 
Materials/Parts 
Adapter, socket wrench, 1/2-inch 
Container, 1 pint 
female to 3/8-inch male 
Rags, wiping (item 21, Appendix C) 
Bar, pry, 15 to 16-inch 
Solvent, drycleaning (item 28, Appendix C) 
Container, 1-pint capacity 
Washer, nozzle (four required) 
Crowfoot attachment, socket wrench, 
open-end, 3/8-inch drive, 9/16inch 
Personnel Required 
Extension, 3/8-inch drive, 5-inch 
Handle, ratchet, 3/8-inch drive 
One 
Knife, pocket 
Socket, 3/8-inch drive, 112-inch 
Equipment Condition 
Wrench, open-end, 9/16-inch 
Wrench, open-end, 3/4-inch 
Fuel injection caps and hoses removed 
Wrench, torque, 1/2-inch drive 
(page 2-206) 
0 to 150 foot-pound capacity 
2-201 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |