| ||||||||||
| 
 
  | 
![]() TM 5-2420-222-20-1 
HAND THROTTLE CABLE 
This task covers: 
a. 
Removal (page 2-322) 
e.  Repair (page 2-325) 
b. 
Disassembly (page 2-324) 
f. 
Assembly (page 2-325) 
c. 
Cleaning (page 2-324) 
g.  Installation (page 2-326) 
d. 
Inspection/Replacement (page 2-325) 
INITIAL SETUP 
Tools 
Materials/Parts - Continued 
Caps, vise jaw (pair) 
Pin, cotter, cable 
Handle, ratchet, 3/8-inch 
Pin, cotter, cable swivel 
Pliers, slip-joint 
Rags, wiping (item 21, Appendix C) 
Socket, 3/8-inch drive, 7116-inch 
Solvent, drycleaning (item 28, Appendix C) 
Socket, 3/8-inch drive, 9/16-inch 
Threading set, screw 
Personnel Required 
Vise, machinist's 
Wrench, open-end, 112-inch 
One 
Materials/Parts 
Equipment Condition 
Lockwasher, bracket screw 
1. Loader control box door removed 
Lockwasher, U-bolt nut (four required) 
(page 2-1167) 
2. Right Inner platform ramp removed 
(page 2-1095) 
ACTION 
LOCATION 
ITEM 
REMARKS 
REMOVAL 
1. 
Swivel (1) and 
Cotter pin (3) 
a. Using slip-joint pliers, bend ends 
clip (2) 
straight and pull out. 
b. Get rid of. 
2. 
Swivel (1), throttle 
Clip (2) 
Using slip-joint pliers, unsnap from 
lever (4) and 
cable (5). 
cable (5) 
3. 
Throttle lever (4) 
Swivel (1) with 
Take out. 
and clip (2) 
attached cable (5) 
4. 
Throttle lever (4) 
Clip (2) 
Take off. 
2-322 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |