| ||||||||||
| 
 
  | 
![]() TM 5-2420-222-20-1 
FUEL METERING PUMP ADJUSTMENT 
This task covers: 
Adjustment (page 2-222) 
INITIAL SETUP 
Tools 
Materials/Parts 
Pliers, long round nose 
Pin, cotter, speed control rod 
Screwdriver, flat-tip, 3/16-inch 
Wrench, open-end, 5/16-inch 
Personnel Required 
(two required) 
Two 
ACTION 
LOCATION 
ITEM 
REMARKS 
ADJUSTMENT 
1. Loader backhoe 
Engine 
Start and warm up  (TM 5-2420-222-10). 
WARNING 
Be careful of moving parts when working near engine while it is running. Moving parts 
could catch on tools, clothing, or extremities causing serious injury. 
2. Speed control rod 
Cotter pin (3) 
a. Using long round nose pliers, bend 
(1) and washer (2) 
ends straight and pull out. 
b. Get rid of. 
3. Speed control rod 
Washer (2) 
Take off. 
(1) and lever (4) 
4. Lever (4) 
Speed control 
Take out. 
rod (1) 
5. Arm (5) 
Lever (4) 
a. Pull back as far as possible. 
b. Have assistant note engine speed on 
tachometer (6). 
Engine speed should be 2650 rpm. 
NOTE 
If engine speed is correct, skip steps 6 thru 8. 
6. Shaft (7) and 
Nut (9) 
Using 3/16-inch flat-tip screwdriver and 
high idle adjusting 
5/16-inch open-end wrench, loosen. 
screw (8) 
2-222 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |