Click here to make tpub.com your Home Page

Page Title: FUEL METERING PUMP ADJUSTMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-222-20-1
FUEL METERING PUMP ADJUSTMENT
This task covers:
Adjustment (page 2-222)
INITIAL SETUP
Tools
Materials/Parts
Pliers, long round nose
Pin, cotter, speed control rod
Screwdriver, flat-tip, 3/16-inch
Wrench, open-end, 5/16-inch
Personnel Required
(two required)
Two
ACTION
LOCATION
ITEM
REMARKS
ADJUSTMENT
1. Loader backhoe
Engine
Start and warm up (TM 5-2420-222-10).
WARNING
Be careful of moving parts when working near engine while it is running. Moving parts
could catch on tools, clothing, or extremities causing serious injury.
2. Speed control rod
Cotter pin (3)
a. Using long round nose pliers, bend
(1) and washer (2)
ends straight and pull out.
b. Get rid of.
3. Speed control rod
Washer (2)
Take off.
(1) and lever (4)
4. Lever (4)
Speed control
Take out.
rod (1)
5. Arm (5)
Lever (4)
a. Pull back as far as possible.
b. Have assistant note engine speed on
Engine speed should be 2650 rpm.
NOTE
If engine speed is correct, skip steps 6 thru 8.
6. Shaft (7) and
Nut (9)
Using 3/16-inch flat-tip screwdriver and
high idle adjusting
5/16-inch open-end wrench, loosen.
screw (8)
2-222

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business