|
|
TM 5-2410-233-23
TRACK ROLLER FRAME ASSEMBLY REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation, Alignment
INITIAL SETUP
References
Tools and Special Tools
Tool kit, general mechanic's (Item 112, WP 0185
TM 5-2410-233-10
Shop equipment, general purpose repair (Item 97,
Link, lifting, (Item 44, WP 0185 00)
Puller, ratchet lever, cable type (Item 82, WP 0185
Personnel Required
Lifting equipment, 5,000 lb capacity
Three
Bolt, 3/4 -10 x 1-1/2 in.
Equipment Condition
Materials/Parts
Track removed (WP 0119 00)
Lockwasher (7, 13 and 16)
Track roller frame guards removed (WP 0111 00)
Wood block, 4 in. x 4 in. x 12 in.
REMOVAL
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death.
NOTE
Weight of an assembled track roller frame is 4,000 lb (1,804 kg).
1.
Attach ratchet puller to front of track roller frame (1).
1
2,3
5
2.
Install two lifting links (2) with 3/4 -10 x 1-1/2 in.
bolts and attach a suitable lifting device to both points
4
6,7
on front of track roller frame (3 and 4).
3.
Insert a block of wood between equalizer bar and
frame.
4.
Attach ratchet puller to lifting device at point (4).
5.
Lift track roller frame (1) and use ratchet puller to
raise evenly and remove tension on equalizer bar (5).
6.
Remove four capscrews (6) and lockwashers (7) that
386-218
secure front support assembly (3) to track roller frame
(1). Discard lockwashers.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |