Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
EQUALIZER BAR ASSEMBLY REPLACEMENT - CONTINUED
0108 00
INSTALLATION - CONTINUED
5.
Push floor jack with equalizer bar (5) between tracks at rear of tractor. Rotate bar to align one end with left support
assembly (8).
6.
Move floor jack forward to position other end of equalizer bar in line with right upper plate (10).
7.
Install right support (9) over end of equalizer bar (5) and on track roller frame.
NOTE
Make sure equalizer bar is centered on upper plate.
8.
Lower hydraulic jack until weight of equalizer bar (5) is on right upper plate (10).
9.
Install four washers (7) and bolts (6) on right support
(9). Tighten capscrews to 350 lb-ft (475 Nm).
10.
Install two pads (4), plates (3), new lockwashers (2)
and bolts (1) on equalizer bar (5).
11.
Tighten bolts (1) to 350 lb-ft (475 Nm).
5
12.
Lower machine to ground (WP 0178 00).
13.
Close transmission and crankcase guards (WP 0129
14.
Install track roller frame guards (WP 0111 00).
15.
Install right-front track carrier roller. If removed,
3
install left-front carrier roller (WP 0114 00).
2
4
16.
Operate tractor and check for proper operation (TM 5-
1
2410-233-10).
386-149
END OF WORK PACKAGE
0108 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business