TM 5-2420-224-34
Section Ill. TRANSMISSION AND RELATED PARTS
This section illustrates and describes procedures for maintenance of the transmission and related parts.
A list of tasks contained in this section is shown below.
Page
Transmission Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Power Take-Off (PTO) Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Power Take-Off (PTO) Control Linkage Replacement and Adjustment . . . . . . . . . . . .
Transmission Access Cover Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . .
Transmission Top Cover Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Air Shift Solenoid Valve Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Air Shift Valve Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Transmission Shift Lines Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Transmission
Shift
Controls
Replacement
.
.
.
.
.
.
.
.
.
.
.
.
.
Transmission Mount Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TRANSMISSION REPLACEMENT
This task covers:
a. Removal b. Inspection c. Installation
INITIAL
SETUP
Personnel Required: (2)
Tools and Special Equipment:
Shop Equipment, SC 4910-95-CL-A31
References:
Tool Kit, SC 5180-90-CL-N26
TM 5-2420-224-20
Shop Equipment, SC 4910-95-CL-A63
LO 5-2420-224-12
Materials/Parts:
Equipment Condition:
Strap, Tiedown (4)
Condition Description
Reference
Packing (3)
TM 5-2420-224-20
Backhoe (SEE) or Crane
Washer, Lock (4)
(HMMH) in Three-Point
Stance
Seal (2)
Engine Removed
Washer, Spring
Tension (2)
Floor Platform Removed
TM 5-2420-224-20
Appendix B, Item 24
Grease, Molybdenum
Transmission Shift
Disulfide
Controls Removed
|