Click here to make tpub.com your Home Page

Page Title: POWER TAKE-OFF (PTO) CONTROL LINKAGE REPLACEMENT AND ADJUSTMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
POWER TAKE-OFF (PTO) CONTROL LINKAGE REPLACEMENT AND
ADJUSTMENT
This task covers: a. Removal b. Installation c. Adjustment
Tools and Special Equipment:
References:
Shop Equipment, SC 4910-95-CL-A31
TM 5-2420-224-20
Tool Kit, SC 5180-90-CL-N26
Equipment Condition:
Materials/Parts:
Reference
Condition Description
Packing (2)
TM 5-2420-224-20
Cab Tilted
Packing
1.
REMOVE two clips (1), two ball sockets (2),
and control LEVER (3).
2.
REMOVE capscrew (4), washer (5), bearing
(6), packing (7), bushing (8), LEVER (9),
packing (10), and washer (11). DISCARD
PACKINGS.
R E M O V E capscrew (12), control LEVER
3.
assembly (13), and packing (14). DISCARD
PACKINGS.
1.
INSTALL new packing (14), control LEVER
assembly (13), and capscrew (12).
INSTALL washer (11), new packing (10),
2.
LEVER (9), bushing (8), new packing (7),
bearing (6), washer (5), and capscrew (4).
INSTALL control LEVER (3), two ball sockets
3.
(2), and two clips (1).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business