TM 5-2410-233-23
MAIN (BULLDOZER) CONTROL VALVE, RIPPER CONTROL VALVE
AND RELIEF VALVE REPLACEMENT
THIS WORK PACKAGE COVERS
Main (Bulldozer) Control Valve: Removal, Installation
Ripper Control Valve: Removal, Installation
Relief Valve: Removal, Installation, Relief Valve Setting Adjustment
INITIAL SETUP
Materials/Parts - Continued
Tools and Special Tools
Gasket (24 and 31)
Tool kit, general mechanic's (Item 112, WP 0185
Lockwasher (10, 19, 22, 26, 33, 35, 43, 46, and 53)
Shop equipment, general purpose repair (Item 97,
O-ring (48 and 55)
References
Link, lifting (Item 43, WP 0185 00)
Sling, nylon (Item 100, WP 0185 00)
Lifting equipment, 250 lb capacity
Bolt, 1/2 -13 x 1 in.
Materials/Parts
Personnel Required
Cap set, protective (Item 2, WP 0184 00)
Two
Compound, sealing (Item 9, WP 0184 00)
Equipment Condition
Oil, lubricating (Item 22, 23 or 24, WP 0184 00)
Hydraulic tank removed (WP 0166 00)
Hydraulic tilt control valve removed (WP 0150 00).
Rag, wiping (Item 28, WP 0184 00)
CAUTION
To prevent contamination of hydraulic system, keep work area clean.
Place protective caps or plugs on all hydraulic system openings as components are removed.
Wipe all components clean before they are installed. Failure to do so could result in equipment
damage due to contamination of hydraulic system.
|