|
|
TM 9-2320-363-20-2
STE/ICE SHUNT REPLACEMENT
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
INITIAL SETUP I
Applicable Configuration:
Materials/Parts (Cont):
M917A1 and M917A1 w/MCS
Tags, IdentificationAppendix C, Item 26
Tools and Special Equipment:
Personnel Required: (2)
Tool Kit, SC 5180-90-CL-N26
Equipment Condition:
Materials/Parts:
Reference
Condition Descripti on
Nut, Lock (2)
Page 2-29
Batteries Disconnected
Washer, Lock (2)
REMOVAL
NOTE
Tag all wires and cables prior to removal to aid in installation.
1.
REMOVE TWO SCREWS (1), TWO LOCK WASHERS (2), THREE CABLES (3), AND TWO WIRES (4) FROM
STE/ICE SHUNT (5). DISCARD LOCK WASHERS.
2.
REMOVE TWO SCREWS (6) AND TWO WIRES (7).
3.
REMOVE TWO LOCK NUTS (8), TWO WASHERS (9), TWO SCREWS (10), TWO WASHERS (11), AND STE/ICE
SHUNT (5) FROM FRAME RAIL (12). DISCARD LOCK NUTS.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |