| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
STE/ICE SHUNT REPLACEMENT (CONT) 
CLEANING/INSPECTION 
Clean and inspect all parts in accordance with Chapter 2. 
INSTALLATION 
1. 
INSTALL STE/ICE SHUNT (1), TWO WASHERS (2), TWO SCREWS (3), TWO WASHERS (4), AND TWO NEW 
LOCK NUTS (5) ON FRAME RAIL (6). 
2. 
INSTALL TWO WIRES (7) AND TWO SCREWS (8) ON STE/ICE SHUNT (1). 
3. 
INSTALL THREE CABLES (9), TWO WIRES (10), TWO NEW LOCK WASHERS (11), AND TWO SCREWS (12). 
NOTE 
Follow-on Maintenance: 
Connect batteries (page 2-29). 
4-264.2 Change 3 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |