|
|
TM 9-2320-363-20-2
STE/ICE SHUNT REPLACEMENT (CONT)
CLEANING/INSPECTION(
Clean and inspect all parts in accordance with Chapter 2.
INSTALLATION
1.
INSTALL STE/ICE SHUNT (1), TWO WASHERS (2), TWO SCREWS (3), TWO WASHERS (4), AND TWO NEW
LOCK NUTS (5) ON FRAME RAIL (6).
2.
INSTALL THREE CABLES (7), TWO NEW LOCK WASHERS (8), AND TWO SCREWS (9).
3.
INSTALL TWO WIRES (10) AND TWO SCREWS (11) ON STE/ICE SHUNT (1).
NOTE
Follow-on Maintenance:
Connect batteries (page 2-29).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |