Click here to make tpub.com your Home Page

Page Title: STE/ICE SHUNT REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
STE/ICE SHUNT REPLACEMENT
This task covers:
a. Removal
b. Cleaning/Inspection c. Installation
INITIAL SETUP
Personnel Required: (2)
Applicable Configuration:
All except M917A1 and M917A1 w/MCS
Equipment Condition:
Tools and Special Equipment
Reference
Condition Description
Tool Kit, SC 5180-90-CL-N26
Page 2-29
Batteries Disconnected
Materials/Parts:
Nut, Lock (2)
Washer, Lock (2)
REMOVAL
NOTE
Tag all wires and cables prior to removal to aid in installation.
1.
REMOVE TWO SCREWS (1) AND TWO WIRES (2).
2.
REMOVE TWO SCREWS (3), TWO LOCK WASHERS (4), AND THREE CABLES (5) FROM STE/ICE SHUNT (6).
DISCARD LOCK WASHERS.
3.
REMOVE TWO LOCK NUTS (7), TWO WASHERS (8), TWO SCREWS (9), TWO WASHERS (10), AND STE/ICE
SHUNT (6) FROM FRAME RAIL (11). DISCARD LOCK NUTS.
Change 3 4-263

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business