|
|
TM 9-2320-303-24-1
FRONT HUB, DRUM, WHEEL BEARINGS, AND SEAL REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation, Adjustment (End Play)
INITIAL SETUP
Materials/Parts
Maintenance Level
Unit
Oil, lubricating (Item 33, WP 0312 00)
Tools and Special Tools
Gasket (P/N 450755)
Tool kit, general mechanic's (Item 102, WP 0313
Seal, oil (P/N 35066)
Washer, lock (P/N 380GX108) (2)
Handle, driver (Item 31, WP 0313 00)
Indicator, dial (Item 36, WP 0313 00)
Washer, lock (P/N MS35338-140) (6)
Inserter, ABS ring (Item 37, WP 0313 00)
References
Pan, drain (Item 62, WP 0313 00)
Wrench, torque, 0-300 lb-in (Item 109, WP 0313
Equipment Condition
Wrench, torque, 15-75 lb-ft (Item 110, WP 0313
Front wheel removed (TM 9-2320-303-10)
Wrench, torque, 50-250 lb-ft (Item 111, WP 0313
Front anti-lock brake system (ABS) sensor
removed (WP 0091 00)
NOTE
Front axle ABS tone ring replacement is covered in this work package.
REMOVAL
1.
Remove pressure relief screw, spring, and pawl assembly (1) from slack adjuster (2).
NOTE
Perform step 2 to obtain enough clearance between brake drum and brakeshoes to remove brake drum.
2.
Turn adjusting nut (3) counterclockwise.
2
1
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |