Click here to make tpub.com your Home Page

Page Title: ALTERNATOR AND VOLTAGE REGULATOR REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-303-24-1
ALTERNATOR AND VOLTAGE REGULATOR REPLACEMENT
THIS WORK PACKAGE COVERS
Alternator: Removal, Installation
Voltage Regulator: Removal, Installation
INITIAL SETUP
References
Maintenance Level
Unit
Equipment Condition
Tools and Special Tools
Master battery switch in OFF position (TM 9-2320-
Tool kit, general mechanic's (Item 102, WP 0313
303-10)
Parking brake set (TM 9-2320-303-10)
Materials/Parts
Tags, marker (Item 42, WP 0312 00)
Washer, lock (P/N J50-09)
ALTERNATOR REMOVAL
NOTE
Tag wires prior to removal.
Nuts may vary in size; note size and location of nuts prior to removal to aid in installation.
1.
Remove nut (8), washer (7), and 12V positive lead (6) from 12V positive terminal (5).
2.
Remove nut (1), washer (2), and ground lead (3) from negative terminal (4).
3.
Remove nut (12), washer (11), and 24V positive lead (10) from 24V positive terminal (9).
3
2
4
1
12
11
10
9
5
6
7
402-908
8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business