Click here to make tpub.com your Home Page

Page Title: PRIMARY II AIR TANK AND FITTINGS REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-302-20-2
PRIMARY II AIR TANK AND FITTINGS REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Tools and Special Tools
References
Tool kit, general mechanic's (Item 50, WP 0306 00)
Materials/Parts
Equipment Condition
Compound, sealing, pipe (Item 13, WP 0305 00)
Air system drained (TM 9-2320-302-10)
Tags, marker (Item 34, WP 0305 00)
Nut, lock (P/N M45913/16CG5C) (6)
Spare tire removed (TM 9-2320-302-10)
REMOVAL
NOTE
Tag tubes to aid in installation.
1.
Disconnect three tubes (6) from air tank (9).
2.
Remove four locknuts (5), washers (4), and air tank (9). Discard locknuts.
3.
Remove two locknuts (1), screws (2), and mounting brackets (3) from air tank (9). Discard locknuts.
4.
Remove three elbows (7), plug (10), and drain valve (8) (M915A3 Old Model) from air tank (9).
5.
For M915A3 New Model, M916A3, and M917A2, remove auto drain valve (WP 0171 00).
3
1,2
3
1,2
4
5
4
5
10
6
7
7
8
9
6
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business