|
|
TM 9-2320-302-20-2
PRIMARY I AIR TANK AND FITTINGS REPLACEMENT (M915A3, M916A3) - CONTINUED
0183 00
INSTALLATION
WARNING
Adhesives and sealing compounds can burn easily, can give off harmful vapors, and are harmful to skin
and clothing. To avoid injury or death, keep away from open fire and use in a well-ventilated area. If
adhesives or sealing compound contacts skin or clothing, wash immediately with soap and water.
Ensure all air lines and fittings are clear of debris and excess pipe sealing compound does not enter air
lines or fittings. Failure to follow this warning could result in injury to personnel or damage to equip-
ment.
For M915A3 New Model and M916A3, install auto drain valve (WP 0171 00).
1.
2.
Lightly coat pipe threads of two plugs (6), drain valve (11) (M915A3 Old Model), check valve (9) and two elbows (7)
with pipe sealing compound. Install plugs, drain valve, check valve, and elbows on air tank (10).
3.
Install air tank (10) to two mounting brackets (3) with two screws (4) and new locknuts (5).
4.
Install air tank (10) with four washers (2) and new locknuts (1).
5.
Connect two tubes (8) to air tank (10).
2
3
1
1
4
2
5
4
5
6
7
8
9
6
10
11
7
8
6.
Start vehicle and build air pressure (TM 9-2320-302-10). Check for leaks.
Install rear platform (M915A3) (WP 0261 00) or chassis guard screen (M916A3) (WP 0262 00).
7.
END OF WORK PACKAGE
0183 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |