|
|
TM 5-2420-224-34
FRONT LOADER/FORKLIFT CONTROL VALVE REPAIR (CONT)
4.
INSTALL low body section valve BODY (8),
four new packings (9), and blanking plate
(10).
5.
INSTALL front loader/forklift control valve body
SECTION (11) and four new packings (12).
6.
INSTALL solenoid-operated hand tool valve
BODY (13) and four new packings (14).
20-31
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |