Click here to make tpub.com your Home Page

Page Title: ASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
FRONT LOADER/FORKLIFT CONTROL VALVE REPAIR (CONT)
FRONT LOADER/FORKLIFT CONTROL VALVE
CAUTION
packings
Make  sure  all
between valve sections are
r e p l a c e d whenever nuts on tie
rods are loosened for any
r e a s o n . Failure to do so could
result in leaks and possible
d a m a g e to valve.
NOTE
Apply coat of lubricating oil to
packings prior to assembly.
INSTALL three nuts (1) and three new lock
1.
washers (2) on three new tie RODS (3).
INSTALL intake manifold BODY (4) and four
2.
new packings (5).
INSTALL solenoid-operated front loader/forklift
3.
valve BODY (6) and four new packings (7).
20-30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business