Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
FRONT LOADER/FORKLIFT CONTROL VALVE REPAIR (CONT)
lNSTALL outlet BODY (15).
7.
NOTE
Before tightening nuts, make sure
equal amount of threads are
exposed on each end of tie rods.
INSTALL three new lock washers (16) and
8.
three NUTS (17). TIGHTEN NUTS to 16 2
Ib-ft (32.5 2.7 Nm).
NOTE
Follow-on Maintenance:
Install front loader control valve
and bracket (SEE) or forklift
control valve and bracket (HMMH)
Adjust front loader control valve
( S E E ) or forklift control valve
(HMMH) pressure settings (page
Adjust front loader (SEE) or forklift
(HMMH)  linkage  (TM5-2420-
224-20).
Adjust front loader (SEE) or forklift
(HMMH) float (TM 5-2420-224-20).
20-32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business