Click here to make tpub.com your Home Page

Page Title: Section IV. POWER TAKE-OFF (PTO) REPAIR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
Section IV. POWER TAKE-OFF (PTO) REPAIR
POWER TAKE-OFF (PTO) REPAIR
This task covers:
a. Disassemble b. lnspection c. Assembly
Equipment Condition:
Tools and Special Equipment:
Shop Equipment, SC 4910-95-CL-A31
Condition Description
Reference
TOOI Kit, SC 5180-90-CL-N26
Power Take-Off (PTO)
Removed
Materials/Parts:
Seal
Packing
Packing
Oil, Lubricating
REMOVE six screws (1), flange (2), and push
1.
SWITCH (3) from Power Take-Off assembly
(4).
REMOVE SEAL (5) from flange (2). DISCARD
2.
SEAL.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business