|
|
TM 5-2420-224-34
CYLINDER HEAD REPAIR
This task covers:
a. Disassembly
b. Inspection
c. Assembly
INITIAL SETUP
Materials/Parts:
Tools and Special Equipment:
Kit, Parts
Shop Equipment, SC 4910-95-CL-A31
Tool Kit, SC 5180-90-CL-N26
Grease, Silicone
Appendix B, Item 25
Drift Pin, P/N 615 589 01 15 00
Oil, Lubricating
Appendix B, Item 30
Gauge, P/N 001 589 53 21 00
Installation Tool, P/N 346 589 03 15 00
References:
Installation Tool, P/N 352 589 00 43 00
Mandrel, P/N 117 589 03 23 00
TM 5-2420-224-20
Mandrel, P/N 617 589 05 23 00
Puller, P/N 352 589 00 33 00
Equipment Condition:
Reamer, P/N 000 589 11 53 00
Reference
Condition Description
Reamer, P/N 000 589 10 53 00
Reamer, P/N 000 589 18 53 00
TM 5-2420-224-20
Fuel Tank Lines and
Removal Tool, P/N 110 589 02 15 00
Fittings Removed
Socket, P/N 000 589 75 09 00
Cylinder Head Removed
Wrench, P/N 346 589 51 03 00
DISASSEMBLY
1.
USING SOCKET, REMOVE six injector
nozzle HOLDERS (1).
2.
USING PULLER, REMOVE six INJECTORS
(2) and seal rings (3).
DISCARD seal
RINGS.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |