Click here to make tpub.com your Home Page

Page Title: INSTALLATION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
FRONT AXLE ASSEMBLY REPLACEMENT (CONT)
16. APPLY COAT of SEALING COMPOUND to
two SCREWS (15 and 16) and INSTALL
SCREW (15), new PACKING (17), SCREW
(16), and new PACKING (18).  TIGHTEN
SCREWS to 45 lb-ft (60 N.m).
17. USING suitable LIFTING DEVICE, RAISE
VEHICLE off jack stands as required and
place right spring (19) in position.
18. REPEAT STEP 17 for left spring.
19. LOWER VEHICLE onto jack stands
20. INSTALL screw (20), COVER (21), and new
lock nut (22). TO COMPLETE installation of
right spring (19), TIGHTEN to 103 lb-ft (140
N.m).
21. REPEAT STEP 20 for left spring.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business