|
|
TM 5-2420-224-34
Table 2-1. Troubleshooting (Cont)
Malfunction
Test or Inspection
Corrective Action
HYDRAULIC SYSTEM (CONT)
k.
Disconnect 0-5000 psi (0-345 bar) pressure gage from fitting in inlet (2) of
control valve (3).
l.
Install cap (1) on fitting in inlet (2) of control valve (3).
Step 2.
Check backhoe/crane relief valve pressure as follows:
NOTE
Make sure front loader/forklift is resting on flat surface and backhoe/crane is in three-point
stance.
b. Remove seven screws (1) and seven washers (2) from cover (3).
NOTE
Step c is for SEE only.
c.
Disconnect wire (4) and set cover (3) aside.
NOTE
Step d is for HMMH only.
d. Disconnect two wires (4) and set cover (3) aside.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |