| ||||||||||
| 
 
  | 
![]() TM 5-2420-222-20-1 
THERMOSTAT - CONTINUED 
INSTALLATION - CONTINUED 
NOTE 
FOLLOW-ON MAINTENANCE: 
1. 
Fill radiator (page 2-368). 
2. 
Install hood (page 2-1025). 
TASK ENDS HERE 
THERMOSTAT HOSES AND CLAMPS 
This task covers: 
a. Removal (page 2-400) 
c. 
Inspection/Replacement (page 2-402) 
b. Cleaning (page 2-401) 
d. 
Installation (page 2-402) 
INITIAL SETUP 
Tools 
Personnel Required 
Screwdriver, flat-tip, 3/16-inch 
One 
Materials/Parts 
Equipment Condition 
Detergent, GP (item 7, Appendix C) 
1. Hood removed (page 2-1025) 
Rags, wiping (item 21, Appendix C) 
2. Radiator drained (page 2-368) 
Solvent, drycleaning 
(item 28, Appendix C) 
ACTION 
LOCATION 
ITEM 
REMARKS 
REMOVAL 
NOTE 
Serial Numbers 235786 thru 235999 use an L-shaped preformed hose. Serial Numbers 319995 thru 
342573 use a straight hose. 
1. Preformed hose (1) 
Two clamps (3) 
Using 3/16-inch flat-tip screwdriver, 
or straight hose (2) 
loosen. 
2-400 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |