|
|
TM 5-2420-222-20-1
ACCELERATOR PEDAL, FOOT ACCELERATOR ROD, AND SPEED CONTROL ARMS
This task covers:
a.
Removal (page 2-328)
e. Repair (page 2-331)
b.
Disassembly (page 2-330)
f.
Assembly (page 2-331)
c.
Cleaning (page 2-330)
g. Installation (page 2-332)
d.
Inspection/Replacement (page 2-330)
h. Adjustment (page 2-332)
INITIAL SETUP
Tools
Materials/Parts
Caps, vise jaw (pair)
Plate, locking, rod
Hammer, ball-peen, 1-pound head
Rags, wiping (item 21, Appendix C)
Pliers, slip-joint
Solvent, drycleaning (item 28, Appendix C)
Punch, straight drive-pin, 1/8-inch
Rule, steel, machinist's, 6-inch
Personnel Required
Screwdriver, flat-tip, 3/16-inch
Threading set, screw
Two
Vise, machinist's
Wrench, adjustable, 0 to 0.760-inch
Equipment Condition
Wrench, open-end, 7/16-inch
Right inner platform ramp removed
Materials/Parts
(page 2-1095)
Pin, cotter, control cable
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
Cable (1) and
Cotter pin (3)
a. Using slip-joint pliers, straighten
washer (2)
ends and pull out.
b. Get rid of.
2.
Cable (1) and
Washer (2)
Slide off.
arm (4)
3.
Arm (4)
Cable (1)
Take out.
4.
Arm (5) and
Locking plate (7)
a. Using slip-joint pliers, take off.
rod (6)
b. Get rid of.
2-328
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |