TM 5-2410-237-23
VALVE MECHANISM MAINTENANCE
THIS WORK PACKAGE COVERS
Removal, Disassembly, Cleaning, Inspection, Assembly, Installation
INITIAL SETUP
Materials/Parts - Continued
Tools and Special Tools
Tool kit, general mechanic's (Item 122, WP 0250
O-ring (12)
Pin (17)
Shop equipment, general purpose repair (Item 106,
Plug (18)
References
Materials/Parts
Cleaning compound, solvent (Item 4, WP 0249 00)
Compound, antiseize (Item 6, WP 0249 00)
Equipment Condition
Oil, lubricating (Item 26, WP 0249 00)
Valve mechanism cover removed (WP 0017 00)
Tag, marker (Item 37, WP 0249 00)
REMOVAL
1.
Loosen 12 nuts (1) and adjustment screws (2) to have maximum valve clearances.
2.
Remove six capscrews (3) washers (4) from rear support bracket (5), four angle brackets (6) and eye bracket (7) that
secure rocker shaft (8).
3.
Remove rocker shaft (8) from cylinder head (9).
9
1
3
7
2
4
6
8
5
387-156
|