Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
TRACK ROLLER FRAME ASSEMBLY REPLACEMENT - CONTINUED
0110 00
INSTALLATION - CONTINUED
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance
during procedure. Ensure that any lifting device used is in good condition and of suitable load
capacity. Keep clear of heavy parts supported only by lifting device. Failure to follow this
warning may cause injury or death.
Ratchet puller must be attached to track roller frame in a manner to evenly distribute weight
of frame. Failure to do so may cause frame to tip, causing personal injury or death.
NOTE
Weight of front support assembly is approximately 70 lb (32 kg)
9.
Attach lifting device to lifting links (2) and both lifting points (3 and 4) on front of track roller frame (1).
10.
Attach ratchet puller to front of track roller frame (1) and lifting point (4).
NOTE
Do not hit front support assembly when track roller frame is put into position under equalizer bar.
11.
Lift track roller frame (1) into position on equalizer bar (5).
12.
Lift track roller frame (1) and use ratchet puller to
1
2,3
5
raise evenly until capscrew holes in front support
assembly (3) are aligned with capscrew holes in track
4
6,7
roller frame.
13.
Install front support assembly (3) to track roller frame
(1) with four new lockwashers (7) and capscrews (6).
Tighten capscrews to 350 lb-ft (475 Nm).
14.
Lower track roller frame (1) until weight is on equal-
izer bar (5). Remove lifting device, bolts, lifting links
and ratchet puller.
386-218
15.
Install track roller frame guards (WP 0111 00).
16.
Install track (WP 0119 00).
ALIGNMENT
NOTE
The following steps must be completed on each side of machine.
1.
Place machine on flat and level surface.
2.
Measure and mark centerline of sprocket (18) and centerline of rear track carrier roller (10). Centerlines should be lined
up with each other. Distance A should equal distance B.
3.
If centerline of sprocket (18) is more than 0.06 in. (1.5 mm) from centerline of rear track carrier roller (10), perform
steps 4-12 to align track roller frame.
0110 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business