|
|
MWO 9-2320-273-20-1
NOTE
Coat threads on bushing check valve, and connector assembly being in-
stalled in steps 5, 6 and 7 with pipe sealing compound prior to installa-
tion.
(5) Install SAE J530 12-8130140B bushing in forward end of air tank as shown in figure 12.
(6) Install 11669271 check valve in bushing on air tank as shown in figure 12.
(7) Install SAE J24610-8 100102BA connector assembly in check valve on air tank as shown in
FIGURE
12
(8) Install CPR104420-4 (57 inches long) tube to connector on front of existing air tank and secure
with sleeve and nut as shown in figure 13. Sleeve and nut retained from 10. a. (8).
FIGURE 13
13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |