|
|
MWO 9-2320-273-20-1
(9) Route tube through clamp to connector assembly on front of new air tank, cut tube, and
secure tube to connector assembly with sleeve and nut as shown in figure 14.
NOTE
Coat threads on plugs, bushing elbow, and draincock being installed in
steps 10, 11, 12, 13 and 14 with pipe sealing compound prior to installa-
tion.
(10) Install SAE J514 6 080109B plug in upper port on air tank as shown in figure 14.
(11) Install MS35784-2 draincock in lower port on air tank as shown in figure 14.
Figure 14
14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |