Click here to make tpub.com your Home Page

Page Title: CRANE FAILS LOAD TEST. (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-34-1
21. CRANE FAILS LOAD TEST (CONT).
7.
TEST OPTIONS
KNOWN INFO
WARNING
Read WARNING
Unit Troubleshooting
tasks completed.
OSS box grounded.
REASON FOR QUESTION
Hoist proximity sensor OK.
Is continuity measured
OSS box calibrated correctly.
If white wire from OSS box top
between connector, terminal
Crane lifts loads in excess of
connector to crane junction box,
B and crane junction box,
load test specifications.
terminal 18 is faulty, 22 to 28 vdc
terminal 18?
will not be input to crane function
POSSIBLE PROBLEMS
lockout valves.
OSS box faulty.
Harness faulty.
Repair wire (see
schematic Fig 2-7) or
NO
replace harness
(Para 6-29).
Verify repair, go to
Step 14 of this Fault.
YES
Replace OSS box
(Para 6-8).
Verify repair, go to
Step 14 of this Fault.
2-688

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business