|
|
TM 9-2320-364-20-1
2-9. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
TABLES (CONT).
Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Interval
Item to Be
Procedure
Not Mission
Item
Inspected
Capable If:
No.
Axle No. 5
b. Check for excessive wear of tie-rod ends
Drag Link
or drag link ends (Para 14-12).
and Tie-Rods
(continued)
NOTE
When using a grease gun, apply lubricant to
the fitting until clean lubricant squeezes out
of the part being lubricated.
Some trucks have lube for life tie-rod ends
and drag link ends. These do not require
lubrication and do not have a lube fitting.
c. Lubricate drag links (1) and tie-rod ends
c. Fittings will not
(2) with GAA every 1,500 miles (2,414 km) or
purge old lubricant out
semiannually, whichever comes first.
of component.
27.1
Semi-
Steering Stop
Check for damaged or missing steering stop
Steering stop bolts are
Annual
Bolt (Axles
bolts (3). Check adjustment of steering stop bolts
missing or damaged or
No. 1, No. 2
(Para 11-10).
will not adjust correctly.
and No. 5)
2-28
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |