Click here to make tpub.com your Home Page

Page Title: Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-20-1
Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Item
Interval
Item to Be
Procedure
Not Mission
No.
Inspected
Capable If:
22
Semi-
Rear
a. Check steering shaft (1) for damaged or
a. Shaft is damaged,
Annual
Steering
bent parts. Replace shaft if bent. Adjust
bent, or misaligned.
Shaft
misaligned shaft. Refer to Para 14-10.
NOTE
If an air-operated grease gun does not purge
the fitting, use a hand-operated grease gun.
If the part does not purge, remove fitting
and clean, install fitting and grease again. If
part still does not purge, refer to
maintenance task for that component.
When using a grease gun, apply lubricant to
the fitting until clean lubricant squeezes out
of the part being lubricated.
When greasing steering shaft slip joint lube
fitting, apply two pumps from a manual
grease gun or two clicks from a pneumatic
grease gun. If rubber boot appears to be full
of grease, remove tie strap from end of
rubber boot. Push boot forward and wipe
off excess grease from boot and steering
shaft. Position rubber boot correctly on
steering shaft and install new tie strap.
b. Lubricate the steering shaft and U-joints
b. Fittings will not
with GAA every 1,500 miles (2,414 km) or
purge old lubricant out
semiannually, whichever comes first.
of component.
2-25

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business