Click here to make tpub.com your Home Page

Page Title: Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-20-1
2-9. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
TABLES (CONT).
Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Interval
Item to Be
Procedure
Not Mission
Item
Inspected
Capable If:
No.
4
Semi-
Battery Box
Check battery box (1) for acid spills and
Annual
debris. If acid spills are visible, clean batteries
(2) and battery box (1).
NOTE
If equipped with arctic batteries, follow
same PMCS procedures for regular
batteries.
Refer to TM 9-6140-200-14 for more
specific details on battery maintenance.
Semi-
Batteries
Check and record specific gravity of each cell.
5
Annual
Check battery cables (1) for fraying, splits and
looseness. Tighten loose parts. Replace
battery cables if frayed or split. Refer to Paras
7-90, 7-91 or 21-4.
2-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business