|
|
TM 9-2320-363-20-2
4.
INSTALL FOUR AIR TUBES (13), TWO HARNESSES (14), SIX CLAMPS (15), THREE WASHERS (16), AND
THREE NEW LOCK NUTS (17) ON PERSONAL GEAR STORAGE BOX (8).
NOTE
Follow-on Maintenance:
Install trailer connector covers (page 4-272).
Install forward tractor protection valve (page 4-528).
Install spare wheel hoist (page 4-630).
Install Basic Issue Items (BII) storage box (page 4-726).
Install tire chain storage boxes (page 4-710).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |