| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
4. 
INSTALL FOUR AIR TUBES (13), TWO HARNESSES (14), SIX CLAMPS (15), THREE WASHERS (16), AND 
THREE NEW LOCK NUTS (17) ON PERSONAL GEAR STORAGE BOX (8). 
NOTE 
Follow-on Maintenance: 
Install trailer connector covers (page 4-272). 
Install forward tractor protection valve (page 4-528). 
Install spare wheel hoist (page 4-630). 
Install Basic Issue Items (BII) storage box (page 4-726). 
Install tire chain storage boxes (page 4-710). 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |