|
|
TM 9-2320-363-20-2
TRAILER CONNECTOR COVER REPLACEMENT
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
INITIAL SETUP
Tools and Special Equipment:
Equipment Condition:
Tool Kit, SC 5180-90-CL-N26
Reference
Condition Description
Materials/Parts:
Page 2-29
Batteries Disconnected
Nut, Kep (8)
P/N 23-10340-125
REMOVAL
NOTE
Step 1 is the same for both 24V trailer connectors.
1.
REMOVE FOUR KEP NUTS (1), FOUR WASHERS (2), FOUR CAPSCREWS (3), FOUR WASHERS (4), AND
CONNECTOR COVER (5). DISCARD KEP NUTS.
NOTE
Steps 2 thru 5 are for the 12V trailer connector.
2.
M915A2 ONLY: REMOVE TIE WRAPS (6) AND TWO KEP NUTS (7) FROM FOUR CLAMPS (8). DISCARD KEP
NUTS.
3.
REMOVE TWO KEP NUTS (9), TWO WASHERS (10), TWO CAPSCREWS (11), AND TWO WASHERS (12).
DISCARD KEP NUTS.
4.
REMOVE TRAILER CONNECTOR (13) FROM MOUNT (14) AND SLIDE GROMMET (15) BACK.
NOTE
Tagging wires is not required.
Connector has color guide for identifying wires
during installation.
5.
LOOSEN SEVEN SCREWS (16) AND REMOVE TRAILER CONNECTOR (13) FROM WIRING HARNESS (17).
CLEANING/INSPECTION
Clean and inspect all parts in accorda nce with Chapter 2.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |