|
|
TM 9-2320-363-20-2
LEFT SIDE PLATFORM REPLACEMENT
This task covers:
a. Removal
b. Cleaning/inspection
c. Installation
INITIAL SETUP
Applicable Configuration:
Personnel Required: (2)
M915A2
Equipment Condition:
Tools and Special Equipment:
Reference
Condition Description
Tool Kit, SC 5180-90-CL-N26
Primary II Air Tank
Removed
Materials/Parts:
Nut, Lock (4)
REMOVAL
REMOVE FOUR LOCK NUTS (1), FOUR WASHERS (2), FOUR SCREWS (3), FOUR WASHERS (4), AND LEFT
SIDE PLATFORM (5). DISCARD LOCK NUTS.
CLEANING/INSPECTION
Clean and inspect all parts in accordance with Chapter 2.
INSTALLATION
INSTALL LEFT SIDE PLATFORM (5), FOUR WASHERS (4), FOUR SCREWS (3), FOUR WASHERS (2), AND
FOUR NEW LOCK NUTS (1).
NOTE
Follow-on Maintenance:
Install primary II air tank (page 4-462).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |