| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
LEFT SIDE PLATFORM REPLACEMENT 
This task covers: 
a. Removal 
b. Cleaning/inspection 
c. Installation 
INITIAL SETUP 
Applicable Configuration: 
Personnel Required: (2) 
M915A2 
Equipment Condition: 
Tools and Special Equipment: 
Reference 
Condition Description 
Tool Kit, SC 5180-90-CL-N26 
Primary II Air Tank 
Removed 
Materials/Parts: 
Nut, Lock (4) 
REMOVAL 
REMOVE FOUR LOCK NUTS (1), FOUR WASHERS (2), FOUR SCREWS (3), FOUR WASHERS (4), AND LEFT 
SIDE PLATFORM (5). DISCARD LOCK NUTS. 
CLEANING/INSPECTION 
Clean and inspect all parts in accordance with Chapter 2. 
INSTALLATION 
INSTALL LEFT SIDE PLATFORM (5), FOUR WASHERS (4), FOUR SCREWS (3), FOUR WASHERS (2), AND 
FOUR NEW LOCK NUTS (1). 
NOTE 
Follow-on Maintenance: 
Install primary II air tank (page 4-462). 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |