|
|
TM 9-2320-363-20-2
TAILLIGHT BRACKET REPLACEMENT (CONT)
CLEANING/INSPECTION
Clean and inspect all parts in accordance with Chapter 2.
INSTALLATION
NOTE
Procedure is the same for both sides of vehicle.
INSTALL TWO WASHERS (1), TWO BOLTS (2), BRACKET (3), TWO WASHERS (4), AND TWO NEW LOCK
NUTS (5).
NOTE
Follow-on Maintenance:
Install trailer connector cover (page 4-272).
Install rear blackout marker (page 4-216).
Install right taillight (page 4-222 or 4-223.0).
Install rear gladhand (page 4-543).
Install left taillight (page 4-220 or 4-223.0).
4-650 Change 3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |