| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
3. 
INSTALL TWO WASHERS (10), TWO CAPSCREWS (9), TWO SPACERS (8), AIR SOLENOID (2), TWO 
WASHERS (7), AND TWO NEW LOCK NUTS (6). 
4. 
CONNECT THREE AIR LINES (3, 4, AND 5) TO AIR SOLENOID (2). 
5. 
CONNECT ELECTRICAL CONNECTOR (1) TO AIR SOLENOID (2). 
NOTE 
Follow-on Maintenance: 
Connect batteries (page 2-29). 
Install rear platform (page 4-734). 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |