Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
INSTALLATION
1.
COAT THREADS OF BUSHING (8) AND PROBE (6) WITH PIPE SEALING COMPOUND.
2.
INSTALL BUSHING (8) AND PROBE (6) IN RADIATOR (9).
NOTE
Perform step 3 for all except M915A2 and M916A1.
3.
CONNECT CONNECTOR (7) TO PROBE (6).
4.
CONNECT TWO WIRES (5) AND INSTALL NEW LOCK WASHER (4), NUT (3), NEW LOCK WASHER (2), AND
SCREW (1) ON PROBE (6).
NOTE
Follow-on Maintenance:
Fill cooling system (Unit PMCS, TM 9-2320-363-20-1).
Connect batteries (page 2-29).
Change 3 4-243

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business