| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
INSTALLATION 
1. 
COAT THREADS OF BUSHING (8) AND PROBE (6) WITH PIPE SEALING COMPOUND. 
2. 
INSTALL BUSHING (8) AND PROBE (6) IN RADIATOR (9). 
NOTE 
Perform step 3 for all except M915A2 and M916A1. 
3. 
CONNECT CONNECTOR (7) TO PROBE (6). 
4. 
CONNECT TWO WIRES (5) AND INSTALL NEW LOCK WASHER (4), NUT (3), NEW LOCK WASHER (2), AND 
SCREW (1) ON PROBE (6). 
NOTE 
Follow-on Maintenance: 
Fill cooling system (Unit PMCS, TM 9-2320-363-20-1). 
Connect batteries (page 2-29). 
Change 3 4-243 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |