|
|
TM 9-2320-363-20-2
INSTALLATION
1.
COAT THREADS OF BUSHING (8) AND PROBE (6) WITH PIPE SEALING COMPOUND.
2.
INSTALL BUSHING (8) AND PROBE (6) IN RADIATOR (9).
NOTE
Perform step 3 for all except M915A2 and M916A1.
3.
CONNECT CONNECTOR (7) TO PROBE (6).
4.
CONNECT TWO WIRES (5) AND INSTALL NEW LOCK WASHER (4), NUT (3), NEW LOCK WASHER (2), AND
SCREW (1) ON PROBE (6).
NOTE
Follow-on Maintenance:
Fill cooling system (Unit PMCS, TM 9-2320-363-20-1).
Connect batteries (page 2-29).
Change 3 4-243
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |