|
|
TM 9-2320-363-20-2
NOTE
If cab air junction block was removed, perform Installation steps 3 and 6 of Cab Air
Junction Block Replacement (page 4-521).
5.
INSTALL COVER (7) AND TWO SCREWS (8).
6.
INSTALL COVER (9), FIVE WASHERS (10), AND FIVE SCREWS (11).
7.
MOVE ENGINE CHECK SWITCH BRACKET (12) IN PLACE AND INSTALL TWO SCREWS (13).
NOTE
Follow-on Maintenance:
Connect batteries (page 2-29).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |