Click here to make tpub.com your Home Page

Page Title: DUAL VOLTAGE CONTROL REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
DUAL VOLTAGE CONTROL REPLACEMENT
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
INITIAL SETUP
Tools and Special Equipment:
Materials/Parts:
Tool Kit, SC 5180-90-CL-N26
Washer, Lock (6)
Equipment Condition:
Washer, Lock (3)
Reference
Condition Description
Tags, Identification
Page 2-29
Batteries Disconnected
REMOVAL
NOTE
Tag wires prior to removal to aid in installation.
Note position of components on terminal posts to aid in installation.
1.
REMOVE THREE NUTS (1), THREE LOCK WASHERS (2), FIVE WIRES (3), AND THREE JAM NUTS (4) FROM
DUAL VOLTAGE CONTROL TERMINAL POSTS (5). DISCARD LOCK WASHERS.
2.
REMOVE SIX SCREWS (6), SIX LOCK WASHERS (7), SIX WASHERS (8), GROUND WIRE (9), AND DU A L
VOLTAGE CONTROL (10). DISCARD LOCK WASHERS.
CLEANING/INSPECTION
Clean and inspect all parts in accordance with Chapter 2.
4-202 Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business