|
|
TM 9-2320-363-20-2
INSTALLATION
NOTE
Dual voltage control is properly installed when center terminal is offset to right as shown
1.
INSTALL DUAL VOLTAGE (10), GROUND WIRE (9), SIX WASHERS (8), SIX NEW LOCK WASHERS (7), AND
SIX SCREWS (6).
CAUTION
Failure to install components as sh own on terminal posts of dual voltage
control can cause equipment failure, system damage, and voiding of warranty.
Do not over tighten jam nuts or damage to dual voltage control may result.
2.
INSTALL THREE JAM NUTS (4), FIVE WIRES (3), THREE NEW LOCK WASHERS (2), AND THREE NUTS (1)
ON DUAL VOLTAGE CONTROL TERMINAL POSTS (5).
NOTE
Follow-on Maintenance:
Connect batteries (page 2-29).
Change 3 4-203
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |