VOLTAGE REGULATOR REPLACEMENT 
This task covers: 
a. Removal 
b. Cleaning/Inspection 
c. Installation 
INITIAL SETUP 
Tools and Equipment: 
Personnel Required: (2) (DDEC III) 
Tool Kit, SC 5180-90-CL-N26 
Equipment Condition: 
Materials/Parts: 
Reference 
Condition Description 
Washer, Lock (2) 
Page 2-29 
Batteries Disconnected 
REMOVAL 
DISCONNECT PLUG (1). REMOVE TWO NUTS (2), IF EQUIPPED, TWO SCREWS (3), TWO LOCK WASHERS 
(4), TWO WASHERS (5), AND VOLTAGE REGULATOR (6). DISCARD LOCK WASHERS. 
CLEANING/INSPECTION 
Clean and inspect all parts in accordance with Chapter 2. 
INSTALLATION 
INSTALL VOLTAGE REGULATOR (6), TWO WASHERS (5), TWO NEW LOCK WASHERS (4), TWO SCREWS 
(3), AND TWO NUTS (2) IF EQUIPPED. CONNECT PLUG (1). 
NOTE 
Follow-on Maintenance: 
Connect batteries (page 2-29). 