| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
OIL FILL TUBE REPLACEMENT 
INITIAL SETUP 
Tools and Special Equipment: 
Materials/Parts (Cont): 
Tool Kit, SC 5180-90-CL-N26 
Nut, Lock 
Materials/Parts: 
Compound, Pipe 
Appendix C, Item 8 
Sealing 
Screw 
P/N 23-1055-050 
Gasket 
P/N 8929302 
NOTE 
Configuration of all except M915A2 and M916A1 oil fill tube differs slightly from 
M915A2 and M916A1. All except M915A2 and M916A1 configuration is shown. 
REMOVAL 
1. 
REMOVE LOCK NUT (1), WASHER (2), CAPSCREW (3), WASHER (2), AND CLAMP (5) FROM STANDOFF 
BRACKET (6). DISCARD LOCK NUT. 
2. 
LOOSEN TWO HOSE CLAMPS (7) AND REMOVE OIL FILL TUBE (8). 
3. 
REMOVE OIL FILL CAP (9) AND RIVET (10) FROM OIL FILL TUBE (8). DISCARD RIVET. 
4. 
REMOVE TWO HOSE CLAMPS (7) AND HOSE (11) FROM COUPLING (12). 
5. 
REMOVE FOUR BOLTS (13), CLAMP (1 4), OIL FILLER COVER (15), AND OIL FILLER GASKET (16) FROM 
ENGINE BLOCK (17). DISCARD GASKET. 
6. 
REMOVE COUPLING (12) AND IRON NIPPLE (18) FROM OIL FILLER COVER (15). 
7. 
REMOVE CAPSCREW (19), WASHER (20), AND STANDOFF BRACKET (6) FROM ENGINE BLOCK (17). 
CLEANING/INSPECTION 
Clean and inspection all parts in accordance with Chapter 2. 
INSTALLATION 
1. 
INSTALL STANDOFF BRACKET (6), WASHER (20), AND CAPSCREW (19) ON ENGINE BLOCK (17). 
2. 
COAT THREADS OF IRON NIPPLE (18) WITH PIPE SEALANT AND INSTALL IRO N NIPPLE (18) AND 
COUPLING (12) IN OIL FILLER COVER (15). 
4-16 Change 3 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |