Click here to make tpub.com your Home Page

Page Title: Assembly (Cont.)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-34-2
(3) Install cable hook (5) on end support (6)
with new lockwasher (7) and screw (8).
(4) Install two new seal rings (9) on end
supports (6 and 10).
(5) Install new preformed packing (11 ) in end
support (6).
NOTE
When installing ring gear, ensure that
hole on ring gear for manual kickout
shifter arm is at top and aligns with
tie bar.
(6) Align holes in ring gear (12) with holes in
end support (6) and install ring gear (12)
on end support (6).
(7) Install six new lockwashers (13) and
screws (14) on end support (6) and ring
gear (12).
NOTE
Cable hold down side of drum goes
toward motor end of support.
(8) Install end supports (6 and 10) on drum
(4).
(9) Install tie bar (15) on end supports (6 and
10) with two new lockwashers (16) and
screws (17). Torque to 50 Ib-ft (68 Nm).
28-55

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business