|
|
TM 9-2320-360-34-2
22-7.
TORQUE CONVERTER HOUSING/FRONT
SUPPORT REPAIR (CONT)
(2)
Set torque converter housing (5) on wooden
blocks.
NOTE
Pin is properly installed when its
head is 0.300 in. (7.62 mm) above
housing surface.
(3) Install spring (6), shifter valve (7), and pin (8) on
torque converter housing (5).
(4) Install new gasket (9) on torque converter
housing (5).
(5) Align holes and install front support assembly
(10) on torque converter housing (5).
(6) Install three screws (11) in front support
assembly (10). Torque to 36-43 Ib-ft (49-58
Nm).
(7) Install 11 screws (12) in front support assembly
(10). Torque to 36-43 Ib-ft (49-58 Nm).
(8) Install screw (13) in front support assembly (10).
Torque to 36-43 Ib-ft (49-58 Nm).
CAUTION
Keep valve clean and free from nicks
and burrs. Failure to comply will
result in difficulty in assembly.
(9) Install main pressure regulator valve (14) small
end first in front support assembly (10).
(10) Install main pressure regulator valve spring (15)
and valve stop (16) in front support assembly
(10).
22-30 Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |