Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-360-34-1 13-6.  REAR STEERING GEAR REPLACEMENT (CONT) (28) Install  yoke  (39)  on  steering  gear  (2)  with screw  (40)  and  new  locknut  (41).    Torque to 35-40 Ib-ft (47-54 Nm). (29) Install  rear  service  brake  relay  valve  (42) on crossmember (15) with two screws (43) and new locknuts (44). c. Follow-On Maintenance (1) Fill power steering reservoir (LO 9-2320-360-12). (2) Start engine (TM 9-2320-360-10). (3) Build up air pressure to 120-125 psi (827- 862 kPa). (4) Check air hose connections for leaks. (5) Check     steering     hose     connections     for leaks. (6) Shut off engine (TM 9-2320-360-10). (7) Install  longitudinal  torque  rod  (axle  no.    4) (para 15-4). (8) Install  left  fifth  wheel  ramp/extension  (TM 9-2320-360-20). (9) Adjust steering system (para 13-8). 13-24

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business