|
|
307
TM 9-2320-312-24-2
Troubleshooting Section
C. Connect the injection actuation pressure control
C. Access the "Injection Act Press Driver Test".
valve to the engine harness at connector
J500/P500.
D. Disconnect the injection actuation pressure
control valve from the engine harness.
D. Start the engine and run the "Injection Actuation
Pressure Test". The "Injection Actuation Pressure
Note: Do not insert any wire that is larger than
Test" is located in the "Diagnostics" menu of the
18 AWG into the harness connector (P500). Do
electronic service tool. Step through all of the
not insert the probe for the voltage test lamp into
pressure ranges.
the harness connector (P500). These actions will
spread the sockets of the connector which will
Note: This is not the "Injection Act Press Driver Test".
damage the connector. Damaged connectors could
cause intermittent connections.
E. After performing the "Injection Actuation Pressure
Test", check for active diagnostic codes or
E. Insert a 9X-7200 ECM Pin Terminal into each
logged diagnostic codes 42-11.
of the harness connector sockets P500 for the
injection actuation pressure driver.
Expected Result:
F. Connect a voltage test lamp to the ECM pin
The engine should start and the engine should run
terminals that are inserted in the P500 connector
without triggering any diagnostic codes.
and start the "Injection Act Press Driver Test"
with the electronic service tool. Then stop
the "Injection Act Press Driver Test" with the
Results:
electronic service tool.
Yes The problem has been corrected. STOP.
Note: This test procedure may cause a 42-11
No
Injection Actuation Pressure Control Valve Driver
(18). This is normal.
Repair: Replace the injection actuation pressure
Expected Result:
control valve. Verify that the problem is resolved.
The voltage test lamp should come on when the
STOP.
test is active.
Test Step 7. Use the "Injection Act Press
Driver Test" on the Electronic Service
Note: Personality Modules with a manufactured date
Tool to Check the ECM.
before JUNE 99 require an electrical connector
for the injection actuation pressure sensor to be
disconnected in order for the "Injection Actuation
A. Disconnect the ECM engine harness connector
Pressure Control Valve Driver Special Test" to turn
J2/P2.
off the driver for the injection actuation pressure
control valve. If the connector J204/P204 for
B. Turn the ignition key switch to the ON position.
the injection actuation pressure sensor is not
disconnected, the voltage test lamp will remain on
C. Access the "Injection Act Press Driver Test" in the
when the special test is not active.
"Diagnostics" menu of the electronic service tool.
Results:
D. Connect a breakout T to the ECM engine harness
connector J2.
Yes Proceed to Test Step 6.
E. Connect a voltage test lamp to the engine
No Proceed to Test Step 7.
harness connector for the injection actuation
pressure control valve, terminal 61 and terminal
Test Step 6. Perform "Injection Actuation
62 of the breakout T.
Pressure Test".
F. Start and stop the "Injection Act Press Driver
A. Disconnect the injection actuation pressure
Test".
control valve from the engine harness at
connector J500/P500.
Note: This test procedure may cause a 42-11
Injection Actuation Pressure Control Valve Driver
B. Crank the engine for 30 seconds. Crank the
(18). This is normal.
engine three times. This will purge the air from
the system.
Expected Result:
The voltage test lamp should come on when the
test is active.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |