Click here to make tpub.com your Home Page

Page Title: Test Step 3. Measure the Solenoid Resistance of the Injection Actuation Pressure Control Valve
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

306
TM 9-2320-312-24-2
Troubleshooting Section
C. Check the electrical resistance from the ECM
Repair: Perform the following repair:
engine harness connector P2 terminal 61 to P2
terminal 62. The resistance should be within 2
Repair the connectors or wiring and/or replace
ohms of the previous test results.
the connectors or wiring. Ensure that all of the
seals are properly in place and ensure that the
D. Check the electrical resistance from the ECM
connectors are completely coupled.
engine harness connector P2 terminal 62 to the
surrounding terminals for a short circuit:
Verify that the repair eliminates the problem.
Terminal 51
STOP.
Test Step 3. Measure the Solenoid
Terminal 52
Resistance of the Injection Actuation
Pressure Control Valve.
Terminal 63
E. Check the resistance from the ECM engine
A. Turn the ignition key switch to the OFF position.
harness connector P2 terminal 61 to the
surrounding terminals for a short circuit:
B. Disconnect the connector for the injection
actuation pressure control valve J500/P500.
Terminal 50
Note: Ensure that the seal on the connector
Terminal 51
P500 remains on P500 when the connector is
disconnected.
Terminal 52
C. Use a multimeter to measure the resistance
Terminal 60
between the two terminals of the section of the
harness for the injection actuation pressure
Note: The resistance should be greater than 10k
control valve. Record the value that was
ohms.
measured.
F. Check the resistance from the ECM engine
D. Reverse the leads of the multimeter and measure
harness connector P2 terminal 61 to the engine
the resistance again.
ground stud and from P2 terminal 62 to the
engine ground stud. The resistance should be
Expected Result:
greater than 10k ohms.
The solenoid resistance of the injection actuation
Expected Result:
pressure control valve should be between 4.0 and
16.0 Ohms.
The resistance measurements are within the proper
range.
Results:
Results:
Yes Record the measured resistance.
Reconnect the harness connector for the injection
Yes Proceed to Test Step 5.
actuation pressure control valve. Proceed to Test
Step 4.
No
No
Repair: Replace the harness for the injection
actuation pressure control valve.
Repair: Replace the injection actuation pressure
control valve. Start the engine and verify that the
STOP.
fault is no longer active.
Test Step 5. Use the "Injection Actuation
STOP.
Pressure Driver Test" on the Electronic
Service Tool to Check the Harness.
Test Step 4. Measure the Solenoid
Resistance through the Engine Harness.
A. Connect the electronic service tool to the cab
data link connector.
A. Turn the ignition key switch to the OFF position.
B. Turn the ignition key switch to the ON position.
B. Disconnect the ECM engine harness connector
J2/P2.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business